Skip to content

Linux deploy E2E PR-4: Polling + Concurrent + FileTransfer (closeout phase)

Summary

Closeout-phase PR-B. Closes 4 more of the Linux deploy scenarios from the global audit.

Test Pin
L-D8.h Polling: bash echo dispatched + output captured (polling RPC code path)
L-D9.u1 Polling: non-zero exit propagates exactly (99)
L-D10.h Concurrent listening dispatches isolated by ticket (no marker leakage between 3 simultaneous scripts)
L-D11.h File transfer: server-attached ScriptFile reaches agent's workdir + readable by bash

Test plan

  • dotnet build green
  • Linux CI: 4 new tests pass
  • Existing 61 Linux E2E still pass (= 65 after merge)

🤖 Generated with Claude Code

Merge request reports

Loading